X
1 / 3
Close
Our first scheme for BASF Performance Products was in 2015 at their production facility in West Yorkshire, with subsequent works following its completion. We have a long-standing relationship with ‘blue chip’ client Procter & Gamble. Projects include this 300m-long elevated enclosure erected 5m off the ground, which transports pallets of goods across the site. We designed and then constructed two new portal frame buildings for Walkers Snack Foods within an existing food production environment ensuring the most stringent levels of cleanliness.

Commercial engineering

It is important for us as a business to maintain a presence in a range of sectors, and joining the Mott MacDonald Group will only aid this diversification in the years to come.

Clients we have delivered projects for include:

  • BASF Chemicals
  • Procter & Gamble
  • Rolls-Royce
  • Walkers Snack Foods
  • Cadburys
  • BAE Systems

Traditionally our commercial and industrial project experience includes the design and construction of offices, production facilities, warehouse space and aircraft hangers, often requiring a combination of our building and civil engineering expertise, particularly where significant infrastructure or machine foundations are required.

In the commercial/industrial arena we serve a variety of sectors including FMCG, health and education, manufacture and distribution, finance and aerospace.

We are highly experienced in delivering works in ‘live’ environments where our clients require their facilities to remain fully operational throughout delivery of the works. We have delivered commercial/industrial projects throughout the UK, from Bradford to London, working with our clients to deliver first class facilities.

BASF Performance Products
Close
BASF Performance Products Our first scheme for BASF Performance Products was in 2015 at their production facility in West Yorkshire, with subsequent works following its completion.

BASF Performance Products

BASF Performance Products required the construction of foundations for a new process facility, which included the installation of over 70 in-situ concrete bored piles at at their production facility in West Yorkshire.

We also constructed a new two-storey MCC building together with new access roads. All construction was carried out with the added complexity of minimising disruption to on-going site activity as the existing facility remained fully operational throughout the project.

Procter and Gamble
Close
Procter and Gamble We have a long-standing relationship with ‘blue chip’ client Procter & Gamble. Projects include this 300m-long elevated enclosure erected 5m off the ground, which transports pallets of goods across the site.

Procter and Gamble

We have maintained our presence in the commercial and industrial building sector with a long-standing relationship with ‘blue chip’ client Procter & Gamble (P&G).

P&G’s site in London is a busy 24/7 ‘live’ operational site where we have delivered a number of schemes.

First, we constructed a new 76-space car park and express way before beginning an eye-catching project constructing a 300m-long elevated enclosure erected 5m off the ground to allow truck parking below. Two conveyors were installed within the enclosure to transport pallets of finished P&G products across the site.

Walkers Snack Foods
Close
Walkers Snack Foods We designed and then constructed two new portal frame buildings for Walkers Snack Foods within an existing food production environment ensuring the most stringent levels of cleanliness.

Walkers Snack Foods

We designed and constructed two new portal frame buildings to create a new ‘potato intake’ building, and a structure to house a new PC50 potato chip fryer.

In addition to this, a new ‘Multipack’ facility was constructed for the packing and distribution of the end product. As these works were carried out within a ‘food production environment’, extremely high standards of cleanliness were required throughout the construction process and the final design incorporated hygienic inner wall surfaces and hygienic specification doors.

Close

Rolls-Royce plc

JN Bentley has a long history of working with Rolls-Royce, and have recently been appointed to a new framework.

The works pictured at a scheme in Derby consisted of two phases.

Phase 1 incorporated the construction of a new ‘dispatch gantry’ extension with heavy duty concrete floor slabs and new overhead gantry cranes, as well as the upgrade and modification of an existing access road.

Phase 2 consisted of the re-cladding of the existing production test facility building, general civils works to the structure of the production facility, and the installation of a monorail hoist system, plus significant mechanical and electrical installations.

icon-arrow-down-sml icon-arrow-left-lrg icon-arrow-left-sml icon-arrow-right-lrg icon-arrow-right-sml icon-arrow-up-sml icon-champions icon-close icon-download icon-education icon-email icon-grid-view icon-language icon-link-to icon-list-view icon-location icon-login-register icon-minus icon-more icon-phone icon-plus icon-recently-viewed icon-search icon hash key-facts-corner-sash quote-underline social-icon-facebook social-icon-googleplus social-icon-linkedin social-icon-twitter social-share-icon-facebook social-share-icon-facebook social-share-icon-googleplus social-share-icon-googleplus social-share-icon-instagram social-share-icon-instagram social-share-icon-linkedin social-share-icon-linkedin social-share-icon-twitter social-share-icon-twitter social-share-icon-youtube social-share-icon-youtube sina-weibo MM-Shape01-Quote-Views MM-Shape03-Quote-Locations MM-Shape05-Quote-Projects MM-Shape12-Quote-Sectors MM-Shape13-Quote-Expertise MM-Shape14-Quote-About-Us MM-Shape14-Quote-Careers checkmark icon-expand-view icon-apply-now menu sphere icon-cookies icon-legal icon-registered-companies target rotate-screen video-replay-flat video-replay audio-mute audio-play