top of page
Digital Building

Digital Building

About us

Our policies
These are the key policy statements of JN Bentley, Mott MacDonald Bentley and JBA Bentley, setting out the commitments and responsibilities of our business.

Our policies

ABOUT

Awards
Repeat business is the recognition that we’re looking for - but it’s nice to pick up an award or two along the way.

Awards

ABOUT

Who we are
JN Bentley Ltd is part of the global management, engineering and development consultancy Mott MacDonald, offering our clients full feasibility, design and construction services throughout the UK.

Who we are

ABOUT

People
We integrate inclusion and belonging, professional and personal development, and health and wellbeing into our business culture.

People

OUR APPROACH

Preserving resources
Our aim is to reduce water consumption, minimise our waste, and use energy efficiently.

Preserving resources

OUR APPROACH

Supporting society
We act in the best interests of our communities and society as a whole.

Supporting society

OUR APPROACH

Digital rehearsal

Digital rehearsal

Digital rehearsal optimises how we plan the construction phase of our projects.

Digital rehearsal optimises how we plan the construction phase of our projects. It aligns design with the construction programme and drives collaboration between people and technology, enabling project teams to rehearse the construction sequence at the right time with the right set of people to identify the best sequence in terms of safety, supply-chain, operational site interfaces and temporary works logistics. Designers get a better understanding of buildability and construction teams understand the specification and any client operational constraints.

Case study: Hallbank Tunnel

Hallbank involved a short shutdown of an aqueduct supplying 2.5 million customers with 570 million litres of water a day. After nearly two years of main works, our client handed the entire site over to us to complete the connections. At its peak, 90 engineers on round-the-clock shifts worked at each connection. We developed a highly detailed 4D model that facilitated collaborative rehearsals with the team and ensured the operation was meticulously planned. The connections were a success, and the site was handed back to our client early.


The 4D model maximised efficiency and supported collaboration between the design and construction teams. The model also helped to identify temporary works and process constraints, beyond the realm of 3D clash detection.

Case study: Hallbank Tunnel
Case study: Hallbank Tunnel
Case study: Hallbank Tunnel

Case study: Embsay Water Treatment Works

During the investigation and tender stage at Embsay, SYNCHRO 4D was used to create a digital rehearsal to better understand sequencing on an extremely tight site. Outputs from the rehearsal led directly to programme updates, saving 10 weeks and over £100,000 in preliminary site costs.

Case study: Embsay Water Treatment Works
Case study: Embsay Water Treatment Works
Case study: Embsay Water Treatment Works

About us

Supply chain

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

Supply chain

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

FEATURED NEWS ARTICLE

News

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

Loading...

bottom of page